Whether the PHP upgrade still pays off before a replacement sounds like a technical question, but it’s a calculation with three unknowns: how long will your legacy system really keep running, will it stay secured until then, and what’s at stake if something happens in that time? Information as of November 6, 2026.
Four paths for the final year
- Invest. Bring PHP and, if needed, the framework or CMS to a supported version. The legacy system stays secured until the very last day, even if the replacement is delayed.
- Keep it minimal. Only security updates, bug fixes and mandatory changes, such as for the Swiss QR-bill or email sending. No new features.
- Freeze. From a set date, no more changes except security and emergency fixes. New requests only go into the new system. Freezing is only safe as long as security updates are coming from somewhere.
- Switch over. If protection ends before the legacy system does, you bring the switchover forward or replace individual parts first, such as the publicly accessible area. The strangler fig approach in the guide Modernize or rebuild shows how to do this step by step.
Investing, keeping it minimal, freezing and switching over aren’t mutually exclusive. A typical order: first invest or build a bridge, then keep it minimal, and freeze about three months before the switchover.
Investment matrix by remaining lifetime
The investment matrix by remaining lifetime is a rule of thumb for the most common case: your PHP version reaches end of life before the shutdown date or already has, like PHP 8.1 on December 31, 2025. PHP 8.2 follows on December 31, 2026. If your version stays secured until the shutdown, you don’t need an upgrade: keeping it minimal and freezing it in time is enough.
Remaining lifetime in the investment matrix means until the day the legacy system is shut down, not until the new one goes live. Parallel operation and hypercare lie in between.
| Remaining lifetime until shutdown | Small step, e.g. PHP 8.1 or 8.2 to 8.4 | Big step, e.g. PHP 7.4 to 8.4 including the framework |
|---|---|---|
| Under 6 months | Upgrade if it can be finished before the freeze. Otherwise freeze and use a bridge until the shutdown | Freeze, bridge, restrict access. An upgrade would hardly be finished before the shutdown |
| 6 to 12 months | Upgrade, it often takes only a few days. Then keep it minimal | Bridge, if one is confirmed to last until after the shutdown. Otherwise upgrade or switch over parts earlier |
| 12 to 24 months | Upgrade | Upgrade, unless a confirmed bridge is sure to last until after the shutdown |
| Over 24 months or no fixed date | Upgrade, as without a replacement | Upgrade, as without a replacement |
Three things shift the calculation between upgrade and bridge:
- Delays. Plan with the shutdown date plus a buffer. If a bridge lasts exactly until the planned date, it won’t be enough after the first postponement.
- What’s at stake. A publicly accessible shop with customer accounts and payments is a different risk than an internal tool that only runs on the company network.
- What you get anyway. Tests for the most important processes, which you need for an upgrade, later help compare the new system with the old one during parallel operation.
The guide Planning a PHP upgrade shows how big your upgrade step is for each starting version and framework. The end-of-life calendar shows which deadlines for PHP, frameworks and CMSs are coming up through 2029.
Which bridges exist until the switchover?
A bridge extends security updates for a PHP, framework or CMS version that has officially reached end of life. For PHP 8.1 and older, no more official releases are published. Fixes only come as backports, depending on what your hosting provider, your Linux distribution or a commercial vendor applies. With the critical PHP vulnerabilities of October 2026, exactly that decided whether an application on PHP 8.1 was protected. How long your hosting provider offers old versions and whether it charges extra for them is listed in the table of Swiss hosting providers’ PHP deadlines.
The information on the bridges comes from the vendors and projects themselves, retrieved on November 6, 2026. The links are in the sources at the end of the article.
| Bridge | For whom | Deadline according to the vendor | Source |
|---|---|---|---|
| Old PHP version at the hosting provider, sometimes with backports or for a surcharge | Shared hosting | Varies widely by hosting provider. For PHP 8.1 and older only protected if the hosting provider applies backports | Hosting provider table in the guide PHP end of life |
| PHP 8.1 from Ubuntu 22.04 LTS | Own server with Ubuntu 22.04 | Standard security maintenance until May 2027, with Ubuntu Pro (ESM) until May 2032. Canonical also closed the critical PHP vulnerabilities of October 2026 for PHP 8.1 on October 21, 2026 (USN-8948-1) | Canonical |
| PHP 8.2 from Debian 12 | Own server with Debian 12 | Debian LTS until June 30, 2028. The Debian LTS team closed the critical PHP vulnerabilities of October 2026 with DLA-4848-1 | Debian |
| Zend PHP LTS | Own server | PHP 7.4 until December 2026, PHP 8.1 until December 2027. Announced for PHP 8.2, without an end date. Paid | Zend by Perforce |
| TuxCare Endless Lifecycle Support | Own server | PHP 5.2 to 7.4, with no fixed end date. If demand declines, TuxCare announces the end one year in advance. Paid | TuxCare |
| TYPO3 ELTS | TYPO3 10.4, 11.5 and 12.4 | TYPO3 10.4 until April 30, 2027, 11.5 until October 31, 2028, 12.4 until April 30, 2030. The fourth year is only available through TYPO3 partners; for 10.4 it has been running since May 1, 2026. ELTS for TYPO3 9.5 ended on September 30, 2025. Paid | TYPO3 GmbH |
| OpenMage LTS | Magento 1 | No fixed end date: OpenMage 20.x gets patches until two years after 21.x is released. At the end of October 2026, OpenMage 21.0 came out as a third beta. From OpenMage 20.14 on, PHP 8.1 and newer, PHP 8.4 and 8.5 with warnings | OpenMage |
| Drupal 7 Extended Security Support | Drupal 7 | No fixed end date. The Drupal Association certifies HeroDevs and Tag1 Consulting for this; Tag1 commits to updates for as long as possible. Paid | Drupal Association, Tag1 |
| Isolate | Internal applications | No deadline, but no substitute for updates. According to the Swiss Federal Office for Cybersecurity (BACS), restrict access to the people and systems that actually need it, and for critical applications consider temporarily disconnecting them from the internet | BACS |
Three things are often forgotten with bridges:
- A bridge only covers its own layer. TYPO3 ELTS secures TYPO3, not PHP. According to TYPO3, TYPO3 10.4 only runs on PHP 7.2 to 7.4, even with ELTS, and PHP 7.4 hasn’t received official updates since November 28, 2022. Without backports for PHP, the gap underneath stays open. TYPO3 11.5 runs up to PHP 8.3, TYPO3 12.4 up to PHP 8.4.
- A container is not a bridge. After the PHP vulnerabilities of October 2026, patched official Docker images were only released for PHP 8.2 to 8.5. A container on PHP 8.1 remains vulnerable, even if it’s rebuilt.
- Every bridge has a date. Put its end date in the same calendar as the shutdown date. If the switchover is postponed, you’ll see right away whether the bridge still lasts.
Roadmap: 12 months before to 12 months after the switchover
T stands for the switchover day, when the new system takes over the work. The roadmap describes what happens to the legacy system during the 12 months before and after the switchover. How the data comes along completely is covered in the guide Migrating data from the legacy system.
| When (T = switchover day) | What happens to the legacy system |
|---|---|
| T−12 to T−9 months | Decide. Set the shutdown date, line up the PHP, framework and hosting provider deadlines next to it, choose an upgrade or a bridge. Clarify who is responsible for the legacy system until the shutdown |
| T−9 to T−6 months | Secure. Implement the upgrade or bridge, store backups off the server, test the restore once, collect all access credentials. List all processes, integrations and cron jobs the new system has to take over |
| T−6 to T−3 months | Keep it minimal and rehearse. Only security updates and mandatory changes. Trial runs of the data migration, define go/no-go criteria, write the switchover runbook |
| From T−3 months | Freeze. No more changes to the legacy system except security and emergency fixes. Record every exception and carry it over to the new system |
| T−6 weeks to T | Parallel operation and dress rehearsal. Run the new system with a current copy of the data and compare the results. Go through the runbook once in full, with timing and the way back |
| T | Switchover by the runbook. Go or no-go, legacy system to read-only, final data sync, switch over, check. The way back stays open until a set point in time |
| T to T+4 weeks | Hypercare. Check error logs, orders, emails and integrations daily, pick up reports from the team immediately. The legacy system stays available, read-only and secured |
| T+1 to T+3 months | Stabilize. Fix remaining bugs, accompany the first month-end closing in the new system, check redirects and integrations |
| T+3 to T+12 months | Shut down. As soon as the important closings have run in the new system: create a readable archive, shut down the legacy system, revoke its access, cancel its hosting, delete copies that are no longer needed |
Freeze: what gets frozen and what doesn’t
Freeze means no new features, no restructuring, no experiments in the legacy system. It doesn’t mean no security updates. If a critical vulnerability becomes known during the freeze, it still has to be closed, otherwise the vulnerability gets frozen in too. Decide who approves an exception, and record every exception so it isn’t missing from the new system.
Parallel operation: compare instead of hope
In parallel operation, the legacy system and the new system run with the same data. What matters isn’t that the new system starts, but that it delivers the same results: invoice amounts, stock levels, exports, emails to customers. Every deviation is either a bug in the new system or a special case in the old one that nobody wrote down. Usually it’s enough to run copies of the real data through both systems instead of having your team enter everything twice. A switch without parallel operation shifts all the risk onto a single day.
Switchover runbook: the day on one page
The switchover runbook describes the switchover day step by step, each with time, responsible person and check:
- Go or no-go based on the criteria defined in advance.
- Inform customers and employees, set the legacy system to read-only.
- Take a final backup of the legacy system, run the final data sync.
- Switch over: DNS, redirects, integrations, scheduled tasks.
- Check: login, ordering, forms, email sending, payments.
- The latest point in time for the way back, and who triggers it.
Whatever isn’t in the runbook gets improvised on switchover day.
Hypercare: the first weeks after
During hypercare, the first weeks after the switchover, someone watches over the new system more closely than in everyday operation. Some bugs only appear in rare processes, such as the first month-end closing or an integration that only runs at night. Clarify in advance who is reachable during this time, and keep the legacy system available, read-only and secured, until the way back is no longer needed.
Can the legacy system keep running unpatched until it’s replaced?
As long as the legacy system processes personal data, for example of customers, orders or employees, the Swiss Federal Act on Data Protection (FADP) applies until the last day. Art. 8 FADP requires your company and everyone processing data on its behalf to ensure “data security appropriate to the risk”. The Data Protection Ordinance (DPO) specifies this in Art. 1 to 3: the measures must be reviewed over the entire processing period (Art. 1 para. 5 DPO), and Art. 3 para. 2 let. f DPO explicitly states that operating systems and application software are “always kept up to date in terms of security and known critical vulnerabilities are closed”. The decision for a new system doesn’t change any of this as long as the old one still processes personal data. What this means for your specific case is something to clarify with a data protection specialist. The information on data protection is not legal advice.
Who takes care of it until the shutdown?
In the final year, often nobody feels responsible for the legacy system anymore: the new vendor is building the new system, and the previous developer is gone or has already handed over the project. So clarify early who applies updates, reads the hosting provider’s emails and is allowed to trigger the way back on switchover day. How this is split between hosting provider, developer and your company is shown in the guide Who is responsible?.
If you lack the basis for deciding between an upgrade and a bridge, the Takeover Assessment from Unique-P clarifies how big the upgrade step really is for your application.
Sources
- [1]Supported Versions · php.net, retrieved November 6, 2026
- [2]Unsupported Branches · php.net, retrieved November 6, 2026
- [3]TYPO3 Extended Long Term Support (ELTS) · TYPO3 GmbH, retrieved November 6, 2026
- [4]ELTS für TYPO3 10.4 · TYPO3 GmbH, retrieved November 6, 2026
- [5]TYPO3 9, Support-Status · TYPO3, retrieved November 6, 2026
- [6]TYPO3 11, Systemanforderungen und Support · TYPO3, retrieved November 6, 2026
- [7]TYPO3 12, Systemanforderungen und Support · TYPO3, retrieved November 6, 2026
- [8]PHP Long-Term Support · Zend by Perforce, retrieved November 6, 2026
- [9]Extended Lifecycle Support for PHP · TuxCare, retrieved November 6, 2026
- [10]Ubuntu release cycle · Canonical, retrieved November 6, 2026
- [11]USN-8948-1, PHP vulnerabilities · Canonical, October 21, 2026
- [12]Debian Long Term Support · Debian, retrieved November 6, 2026
- [13]CVE-2026-109618 (DLA-4848-1 für Debian 12) · Debian Security Tracker, retrieved November 6, 2026
- [14]Currently Maintained Versions · OpenMage, retrieved November 6, 2026
- [15]Requirements · OpenMage, retrieved November 6, 2026
- [16]Releases magento-lts · OpenMage, retrieved November 6, 2026
- [17]Drupal 7 Extended Security Support Providers · Drupal Association, retrieved November 6, 2026
- [18]D7ES FAQ · Tag1 Consulting, retrieved November 6, 2026
- [19]Warnung vor kritischen Schwachstellen in PHP · Swiss Federal Office for Cybersecurity (BACS), October 21, 2026
- [20]Docker-Images php, Update auf 8.5.12, 8.4.27, 8.3.36, 8.2.35 · docker-library/php, October 21, 2026
- [21]Bundesgesetz über den Datenschutz (DSG), Art. 8 · Fedlex, Schweizerische Eidgenossenschaft
- [22]Verordnung über den Datenschutz (DSV), Art. 1 bis 3 · Fedlex, Schweizerische Eidgenossenschaft